- On the View menu, the Job Grid, Resource Grid, Crew Grid, and Resource Utilization Grid support export to Excel, variable time intervals (day, week, month), stratifying a week at a time, and summary views. These can be set in the filter bar of each grid.
- Support for texting only the General Message has been added to the Send Schedule screen by checking General Only. This enables you to send a text message to a group of people without the schedule.
- Allocation undo has been added for deleted allocations. This is still experimental and should be used with caution.
- Resource Types now have an Allocatable property, which is true by default. When it is set to false (Admin => Resource Types), resources of that type will not appear on Schedule.
Why Event-Based Scheduling Doesn’t Work —and How Growing Construction Companies Should Schedule
As your company grows, your scheduling needs to evolve. Event-based scheduling may have worked when you were smaller, but it’s not built for the complexities of a growing business. By shifting to resource-based scheduling, you can optimize operations, reduce conflicts, and set your company up for long-term success.